Our collaboration with THK led us to execute a comprehensive Pipe Rack Project in Andhra Pradesh. This multifaceted endeavour encompassed erection, fabrication, and designing, totalling 2700 metric tons of materials.
Within a span of four months, our team meticulously executed this project, showcasing our expertise in multiple facets of construction, ensuring a robust infrastructure for THK’s operations.